Yes, the elements can be painted any colour you wish.
We ask that someone is at home when our team arrives as they will need to go inside to measure the thickness of the walls and the level of the floor. It is not necessary to be at home for the rest of the installation. However, we need unhindered access to water and electricity for the duration of the installation and access to the property for Health and Safety reasons.
Yes, CAREBRICK® can be installed in both, solid and cavity walls.
The system can be installed in practically all types of natural stone found in Europe. Up to now, we have not yet come across a natural type of stone that we could not install in.
No. It is not possible to order individual elements and install it yourself. Every installation is carried out exclusively by our own engineers so we can guarantee the efficacy of the system.
Generally, the installation takes between half a day and two days, depending on the type of building and the materials used.